Disclaimer:
Conformance to all of these requirements is dependent upon the manner in which the equipment is installed. The contractor will make certain that all of the electrical wiring and conduit, piping, gas supply, roof penetrations and automatic fire protection systems, as well as the location of the equipment within the building, conform to the cited codes and other references.
The equipment installation location should be reviewed and approved by the local authorities having jurisdiction. Fire suppression is NOT included with the standard booth but is required by NFPA 33. Consult your Global Finishing Solutions sales representative for details of required installation, concrete pit, electrical wiring, conduit, air piping, roof penetrations and automatic fire suppression.
All equipment designs, specifications and components are subject to change at the manufacturer's sole discretion at any time without notice. Data published herein is informational in nature and shall not be construed to warrant suitability of the unit for any particular purpose as performance may vary with the conditions encountered.
|